SinhalaSriLankaTamil-SriLanka
QoinPro.com: Free Bitcoins every 24 hours

How to initiate the EIA process

The project proponent first has to find out whether the project proposal falls within the “prescribed project” list by verifying with the CEA or referring to the Government Gazette No. 772/22 of 24.06.93, 859/14 of 23.02.95, 1104/22 of 06.11.99 and 1108/1 of 29.11.99. The CEA may provide the project proponent with a Basic Information Questionnaire (BIQ) to submit essential information of the project in order for CEA to determine the above (The BIQ may be obtained from the EIA Unit of the CEA Head Quarters or the Provincial / District offices of the CEA. It could also be downloaded from the CEA website.). If the project is a prescribed project requiring EIA/IEE, the CEA will then determine which will be the appropriate Project Approving Agency (PAA) for administering the EIA/IEE process. The PAA will guide the project proponent in preparation of an EIA/IEE.

If the project is located within the coastal zone, then the project proponent should contact the Director General, Coastal Conservation Department.

If the project is located within one mile from the boundary of a National Reserves, the project proponent should contact the Director General of Wildlife Conservation.

Last Updated on Monday, 26 August 2013 10:46

infoactEng

polythene copy copy

neweco

polythene copy

Resulte

manu

envposter-eng

ngoenglish

ReEBwaste

 epayment

weerawila

Latest News & Events

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
CEA has released a report of Thin Polythene Raiding 2017 Manufacturing, trading and usage of any kind of polythene... Read more
Cleaning Campaign at Kaluthara with parallel to the World Environment Day Due to the flood and landslide disaster face by the most... Read more
Identifying of point sources of polluting Kelani River According to the reveal from the media, that Kelani River... Read more
Scheduled Waste Management Licensing in Hospital System As part of the implementing the Hazardous Waste... Read more
Workshop on Solid Waste Management with Sri Lanka Air Force A workshop on Solid Waste Management was organized by the... Read more
Senior staff of CEA Inspect the Polythene usage in Market Level According to the Cabinet Paper No. 17/1405/704/022 on... Read more
Presidential Environmental Awards – 2017 The ceremony “Presidential Environmental Awards – 2017”... Read more
Awareness Program on Solid Waste Management “Pilisaru” Project of the CEA collaborates with the North... Read more
Six-day Induction Program for the New Environmental Officers of CEA With the aim of educating the new Environmental Officers... Read more
Southern Provincial Environmental Pioneers Camp – 2017 The Environmental Pioneer Program, which is specially... Read more
“Pilisaru” Project Signed MoU with the Local Authorities With the aim of facilitating solid waste management for... Read more